Today’s EDP Property Supplement features Conisford Court and Property Editor Caroline Culot describes it as “New city apartments for people ‘who like the best of everything’”
The Lift Being Installed
Open House Weekend – New Pictures
7 Days to go Until Our Opening Weekend
Our Commercial Tenants Have Moved In
Our friends at Pupil Asset have moved into the warehouse-styled ground floor offices with exposed pipes and plant work that provides a modern, light and airy workspace.
Water Finally Connected
Carpeting the Office
Launch Date Set for 12th May 2018
We will be launching Conisford Court on Saturday 12th May 2018
About a dozen apartments have already been reserved and we are delighted that Savills has been retained to act as our residential selling agents when they are marketed at on Saturday 12th May 2018.
To express interest in the remaining apartments please contact
Frances Cooper DipREA
Associate Director Residential Development
Savills, Hardwick House, Agricultural Hall Plain, Norwich, NR1 3FS
Tel :+44 (0) 1603 229 244 Mobile :+44 (0) 7967 555 687 Email :FCooper@savills.com
Website :www.savills.co.uk
The abandoned car has been removed!
Finishing the tarmac
Superb Views from Penthouse with Brise Soleil installed
Fitting the Brise Soleil
One of the ways in which we reduce the cost of heating and cooling at Conisford Court is by installing Bride Soleil sunshades on the elevations which will spend time in direct sunlight in the summer months.
Here colleagues at Alu Systems are doing the preliminary measurements on the first of the stylish aluminum sun shades to provide a template for the proper ones that will be installed over the next two days.
Laying the Tarmac in the Courtyard
Rooftop Solar Panels Connected
Fitting out the Ground Floor Offices
We have a maximum effort to get the ground floor offices fitted out ready for the new tenants.



Kitchen Appliances Are Fitted
With worktops now installed, we are now fitting the branded NEFF integrated appliances in the kitchens. The ovens and hobs and built-in fridge freezer are still to be installed.



Brise Soleil Brackets
Beautiful Bathroom Fittings
As we complete grouting the tiling in the bathrooms we can start to see the quality of the Italian porcelain tiles and the taps and sanitary ware in our bathrooms.
Sealing is still to be completed, shower and bath screens, as well as WC Seats, will be fitted as we progress to completion in each bathroom.


The Big Reveal – Scaffolding Struck
As the scaffolding is taken down, we can start to see the superb textured brick, zinc elevations and the glazed penthouse roof balconies.