Piling Continues at Consiford Court

Another sixteen of the seventy two piles were drilled today by our local Kings Lynn-based contractor GM Piling with each pile being drilled to a depth of 25-30 metres.

20161024piling_-7  20161024piling_-5

20161024piling_-4

20161024piling_-3

Concrete is pumped into each hole before steel reinforcement is placed inside

20161024piling_-2

20161024piling_-1

Evening shot of Rose Lane showing the Castle [l] and Cathedral [r] in the background